Huawei is betting that the future of AI infrastructure will depend as much on energy systems as on computing power
Updated
May 19, 2026 5:43 PM

Blue light painting with a lightbulb. PHOTO: UNSPLASH
As AI companies build larger models and deploy more AI agents, the industry is running into a new constraint: electricity. The challenge is no longer just about computing power. It is increasingly about how to supply, manage and sustain the energy needed to run AI infrastructure at scale.
That was the central argument behind Huawei’s latest AI data center strategy unveiled at its Global AIDC Industry Summit in Dongguan.
The company introduced what it calls a grid-interactive AIDC strategy, focused on redesigning AI data centers around power supply, cooling systems and energy management. AIDC refers to AI data centers built specifically for large-scale AI computing workloads.
The announcement reflects a broader shift happening across the industry. As AI systems grow larger, data centers are consuming more electricity and generating more heat than traditional computing infrastructure was designed to handle. Companies are now being forced to rethink not just chips and servers, but the physical systems supporting them.
Huawei argues that future AI infrastructure will need closer coordination between computing systems and energy grids. The company says traditional data center designs are struggling to keep up with fluctuating AI workloads, rising power density and the growing use of renewable energy sources.
Hou Jinlong, Director of the Board of Huawei and President of Huawei Digital Power, said: "The booming AI industry, widely adopted large models, and numerous AI agents are creating huge energy demands, set to boost the global AIDC capacity. Electricity is essential for computing; energy is the foundation for AI long-term development. Computing and electricity will deeply synergize and empower each other, progressively building an integrated framework that brings together new power systems and AI infrastructure."
A large part of Huawei’s strategy focuses on power architecture. AI workloads can create sudden spikes in electricity demand, especially in high-density computing environments. To manage that, Huawei says it plans to develop new power systems that combine grid-friendly UPS infrastructure with energy storage technologies.
Cooling is becoming another major pressure point. AI servers generate significantly more heat than traditional enterprise systems and Huawei says liquid cooling is now becoming essential for large-scale AI deployments. The company introduced a liquid cooling system designed to improve long-term thermal management inside high-density AI environments.
Huawei is also pushing modular construction methods to reduce deployment times for AI data centers. Instead of building infrastructure entirely onsite, parts of the system can be prefabricated and tested in factories before installation.
Bob He, Vice President of Huawei Digital Power, said: "The global AI industry is booming, and the token demand surges. As such, the AIDC industry is entering the Token era."
As part of that shift, Huawei introduced a proposed measurement system called the TokEnergy Index. The company says the metric is designed to measure the relationship between energy consumption and AI computing output, rather than relying only on traditional data center efficiency metrics such as PUE.
The broader message behind the strategy is that AI infrastructure is becoming an energy engineering problem as much as a computing problem. As global demand for AI continues to rise, companies across the sector are beginning to realise that the future of AI may depend not only on better models, but also on whether power grids and data centers can keep up with them.
Keep Reading
Backed by Menlo Ventures, BrainGrid tackles planning gaps as AI makes software building accessible to more founders.
Updated
April 20, 2026 1:40 PM

A phone screen with app icons. PHOTO: UNPSLASH
As artificial intelligence makes it easier to write code, a different problem is starting to surface. Building software is no longer limited by technical skill alone. Increasingly, the challenge lies in deciding what to build, how to structure it, and how to turn an idea into something that actually works.
That shift sits at the centre of BrainGrid, a startup that has raised $1 million in pre-seed funding led by Menlo Ventures, with participation from Next Tier Ventures and Brainstorm Ventures. The company is building what it describes as an AI-powered planning layer for people who want to create software but may not have a technical background.
The timing reflects a broader change in how products are being built. Tools like Claude Code and Cursor have made it possible to generate working code through simple prompts. For many first-time founders, this has lowered the barrier to entry. But writing code is only one part of the process. Turning that code into a reliable product requires structure, sequencing and clarity—areas where many projects begin to fall apart.
In traditional teams, this responsibility sits with product managers who define what needs to be built and in what order. Without that layer, even well-written code can lead to products that feel disjointed or incomplete. Features may not work together, integrations can break and the final product often does not match the original idea.
BrainGrid is designed to address that gap. Instead of focusing on generating code, it helps users map out the structure of a product before development begins. The aim is to give builders a clearer starting point so that the tools they use—whether human or AI—can produce more consistent results.
The company says more than 500 builders have already used it to create software products across areas like fitness, healthcare and productivity. These range from first-time founders experimenting with new ideas to experienced developers working independently. In many cases, the products are already live and generating revenue, suggesting that the demand is not just for experimentation but for building something that can scale.
For investors, the appeal lies in the evolving role of software development. As AI takes on more of the technical work, the value shifts toward defining the problem and structuring the solution. In that sense, planning becomes less of a background task and more of a core capability.
The US$1 million raise is relatively modest, but it points to a larger trend. As more people gain access to AI tools, the number of potential builders expands. What remains limited is the ability to organise ideas into products that work in the real world. If that shift continues, the next wave of software may not be defined by who can code, but by who can plan.